Energy & Infrastructure

Cement, aggregate and the materials for rebuilding

Reconstruction consumes materials at a scale that no supply chain currently serves. Where they will come from is a genuine investment question.

Luhove gabbro quarry open pit Zhytomyr Oblast Ukraine
Photo: PrAT Antik LTD archive · CC BY-SA 4.0

A reconstruction of the expected scale consumes cement, aggregate, steel, timber, insulation, glass and pipework in quantities that current domestic production does not supply.

Why local production matters so much here

Because these materials are heavy and cheap. Transport is a large share of their delivered cost, which means the economics strongly favour production near the site. Importing cement across a continent is possible and expensive; the same is true of aggregate, and worse.

That is why building materials is one of the more attractive investment categories in Ukraine: the demand is guaranteed for two decades, and geography protects the producer from distant competition in a way it does not in most sectors.

The existing base

Ukraine has a substantial cement industry, quarrying capacity, a large steel sector and timber resources. The base exists. What does not exist is capacity at reconstruction volumes, and some plants are in regions where operating is currently impossible.

The specific opportunities

Expansion of cement and concrete capacity near the regions that will rebuild. Insulation manufacturing, since energy standards in new construction are far higher than the existing stock. Prefabrication plants, which reduce the labour requirement discussed elsewhere in this record. And recycling of demolition rubble into aggregate, which is both cheaper and the only way to deal with the volume of debris.

The constraint

Energy. Cement is one of the most energy-intensive products there is, and a plant needs reliable power. That links this sector directly to the grid work described elsewhere, and no materials investment case is complete without it.

This is the question at the centre of my own work. Setting up an asphalt plant, the first thing I look at is not the machine but where the quarry is: a quarry fifty kilometres away beats one at two hundred every time, and that arithmetic comes before the technical specification. The materials side of reconstruction will move more slowly than the equipment side, because building a plant takes longer than importing a machine.